Corey L.
RUN! - Do Not Buy
I live in Plymouth, MN. All developments are hired out to lowest bidding subcontractors with zero craftmanship or attention to detail. Cheapest materials possible are used and D.R. does not care to make things right once you're in the home. We bought this home in March 2020. Where do I begin? -Kitchen cabinets are made of fake wood and are not even constructed correctly. Doors screwed in the wrong place and gaps all over. -Vinyl flooring is installed without proper sealing. If we have a spill and do not wipe it up immediately the flooring will bubble. Even worse, we had a coffee spill because the pot was not in place and it all ran off the counter, under the dishwasher. The area under and around the dishwasher was not sealed off properly so the coffee ran through the floor down to an unfinished bedroom down the concrete wall and pooled on the concrete floor. The floor under the dishwasher is rotten and needs to be torn out. -Caulk is the lowest quality and is already peeling off of every surface it was used on, if it is not gone already. Every area with caulk was done very sloppily without any care. -Unfinished bedroom has caulk instead of silicone sealant around the window frame. The caulk is still wet 2 years later and is serving no purpose except making a mess. Spray foam insulation was also used and sloppily applied leaving chunks sticking out all over. -Countless gaps in the trim all over the house. No care in making it line up or look nice whatsoever. -Vent openings look like they were cut by a child using a saw for the first time. -Builder grade carpet. Carpet is already completely worn in common areas. Will not last longer than 5 years. -Builder grade paint. Any fingerprint, smudge, splash, etc. will require you to paint over the area. You cannot wash the walls. -Drywall in the ceilings is installed incorrectly. It does not run with the studs so inevitably cracks with show in finished ceilings where the sheetrock is not being supported by studs. -Unfinished bedroom floor is 1" lower than the rest of the room in 1 corner. -Framing for unfinished bedroom was done incorrectly resulting in a complete rebuild of the room to make the walls true and ceiling level. -5th bedroom should have only required 1 wall to be framed prior to finishing. Our contractor had to frame 3 walls to fix subpar work by D.R. and this additional work is $5k out of our pocket. -Windows are the cheapest possible. Leak air and show condensation. -Unfinished bedroom/bathroom/utility room ceiling drywall is cut and pieced together with gaps, chunks missing, pieces drooping. This will all need to be replaced on our dime. -Lumber used to frame unfinished areas has chunks missing, splintering, and partial pieces that should have been thrown away. A couple of 2x4s also have several exposed nails pounded through them. -Some short walls (i.e. a pantry wall) are built at an angle and this is visible to the naked eye. I reference the unfinished areas because those are the areas we can physically see. I assume the rest of the house is built the same way but is covered by finished walls. Now that we are finishing this area and I have another contractor peeling all of these issues apart we are, of course, well past our 1-year warranty for most of this and D.R. has no integrity to even look at it or work with me. We are stuck in a place where we spent a lot of money on what is supposed to be a perfect new home and will be spending several 10s of thousands more dollars to correct their shoddy work. I cannot sell this home and move fast enough.

