Mr Colin T.
Very detailed instructions, and pleasing result.
Very detailed instructions, with every part labelled and numbered. Essential to follow them to the letter, and to build on a flat level base, to which I secured the walls as I put them up, rather than waiting to the end. Also essential to leave all the top bolts slack until the roof sections are slid into position (illustration c on page 31 seems wrong in this respect). Illustraions show what appears to be ventilation in the gable ends, but this is in fact solid witout any openings. Overall, I am delighted with the results, which took two lesurely days to erect.


