Michael C.
Communication and System definition issues
We started our process with Blue Raven back in May. Initially we were offered a standard solar install that did not use the solar panels when the grid went down. This was not acceptable. We kept pushing and then was offered a product called "Sunlight Backup". This system using the panels for backup when the grid is down but only during daylight hours. This system was not recommended because it required isolating certain circuits to prevent overload issues. After several more months we were finally offered a 10K solar backup system to match the 10K solar output. I still was not satisfied so I finally got the Residential Rooftop Solar Permit Package. It provided a lot of information about the solar panels but limited information about the electrical system. Fast forward to November and we finally got our solar system installed. Unfortunately this did not start off well. The solar panels were installed on time and the crew was great. However, the electrical system that manages and monitors everything was started but delayed for 4 days. None of this was the fault of field technicians that installed the components. It was a lack of communication from the management team. First of all I had our electrical panel replaced. The field technician that installed the panel did a great job but when I told him we had battery backup he was surprised because this was not communicated to him and he would have done the job differently. This issue surfaced when the 2nd field technician came to install the electrical system. I told him what the first field technician told me and he spent the first 4 hours trying to figure out the logistics of the system. Neither field technician was the issue. The issue was a lack of communication from management. They depend on independent inspectors to take pictures and measurements to evaluate the system requirements. Unfortunately this approach has a major flaw in that the inspectors do not have the technical skills to really evaluate the final system configuration. If a Field Engineer would have evaluated the site requirements in person most of the issues that field technicians had would have been identified. Our system was started on a Monday and was not finished until the following Friday. Really poor planing. The execution and knowledge by the field technicians was outstanding. Now I am waiting for the final inspection. This system has an app to monitor the solar system. I have requested information about the app but no reply. Holding my breath to see when the final system will be inspected and signed off.
Response from Blue Raven SolarDec 5, 2025
Hi Michael, thank you for sharing your detailed experience with us. We appreciate the time you took to outline the process, and your feedback has been shared with the appropriate teams so we can address the communication and planning issues you encountered. We understand how frustrating the extended timeline, lack of clear communication, and delays between installation phases must have been. Your points regarding site evaluation, coordination between field technicians, and the need for clearer management oversight are especially valuable, and we are using this information to improve our internal processes. We are very glad to see that your system is now installed and operating, and we hope you are already seeing the benefits. If you have any further questions about the monitoring app, inspection status, or anything else, please feel free to reach out. -Emma A.